24/7 Emergency? (678) 863-5620
Trench at the curb of a suburban Georgia street where a new white PVC sewer lateral connects to the main; illustrating sewer line installation for Walnut Grove, Georgia

Sewer Line Installation & Replacement · Walnut Grove, GA

Sewer line installation in Walnut Grove, Georgia, where city code requires connection within 300 feet of a public sewer and the plant's capacity is limited.

Walnut Grove, Walton County · about 7 min / 3.7 mi by road from our Oxford shop. ZIP code 30052.
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Local shop in Oxford, GA

Get a free estimate

or call (678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

The short answer

When do I have to connect to sewer in Walnut Grove, GA?

Walnut Grove's code requires owners to connect when a city sewer is within 300 feet of the property line, a wider reach than Georgia's 200-foot rule. Once sewer is available, the connection is due in 60 days and the septic tank must be abandoned. The owner pays for the line, including any road bore.

Reviewed by Atlanta Water & Sewage Solutions · Last updated

At a glance

County
Walton County
ZIP codes
30052
Sewer
City of Walnut Grove (small land-application sewer system); septic outside it
Water
Walton County Water Department
From our shop
about 7 min / 3.7 mi by road from our Oxford shop
Population
1,685 (ACS 2020-2024 5-year, table B01003)

Permits · City of Walnut Grove (sewer superintendent)

What Chapter 42 asks of a new connection

Walnut Grove's sewer article, adopted in 2017, reads like a checklist for an installer.
  1. 01

    Apply for a building sewer permit on the city's form. There are three classes: residential, commercial and industrial, each with a permit and inspection fee paid at filing.

  2. 02

    Plan for the owner to carry every cost, including boring under the entire road and restoring open cuts across city streets, county roads and state highways.

  3. 03

    Reusing an old building sewer? It has to pass the superintendent's testing first, which can include pressure tests, a mandrel, video inspection or smart pigging at the applicant's expense.

  4. 04

    Notify the superintendent when the line is ready. The connection is made under city supervision, and the excavation stays open until the inspection is documented.

  5. 05

    Within 60 days of sewer becoming available, abandon the septic tank: cleaned of sludge and filled with clean gravel, dirt or other suitable material.

Sewer or septic?

A sewer town with a lot of tanks

The city treats its wastewater at a small plant on Forrester Cemetery Road that land-applies up to 0.05 million gallons a day under state permit GAJ040019. That limit is why sewer hasn't simply spread across town.

Growth is pushing on it. GEFA lent the city $2.44 million in late 2024 for a 0.10 MGD plant and a bigger application field, and the comprehensive plan sketches a Phase 3 that would add 1,000,000 gallons a day through land application and direct discharge.

How to tell which one you have

  • Ask the city whether a main or planned main runs within 300 feet
  • Look for a sewer charge on your city bill
  • Find the tank lid; if there's one, you're not connected

Local facts

Rules that shape a Walnut Grove hookup

Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.

From the city's sewer ordinance and its 2022–2026 plan.
TopicWhat it saysSource
Septic on small lotsNo soil-absorption permit on lots under one acreCity of Walnut Grove Code of Ordinances, Ch. 42, Art. II — Sewer System (Secs. 42-21, 42-23, 42-24)
House below the sewerGrinder-pump ejector station allowed when gravity won't workCity of Walnut Grove Code of Ordinances, Ch. 42, Art. II — Sewer System (Secs. 42-21, 42-23, 42-24)
RainwaterNo downspouts or foundation drains into a building sewerCity of Walnut Grove Code of Ordinances, Ch. 42, Art. II — Sewer System (Secs. 42-21, 42-23, 42-24)
Planned Phase 31,000,000 gpd more treatmentWalnut Grove Comprehensive Plan 2022-2026 (Georgia DCA)
Current expansionAbout 155 more homes and 24,000 gpd for businessesWalnut Grove Comprehensive Plan 2022-2026 (Georgia DCA)

The Walnut Grove story

Grade, gravity and the grinder option

The code prefers a building sewer that arrives below the basement floor so gravity does the work. On the rolling lots around the SR-81 and SR-138 crossroads that isn't always possible. Where the house sits below the main, Walnut Grove allows an ejector station: a tank near the foundation with a submersible grinder pump pushing wastewater into the city's gravity line, sized to health department rules.

We shoot elevations at the house and at the main before quoting, so you know on day one whether you're buying a gravity line or a pump.

The code prefers a building sewer that arrives below the basement floor so gravity does the work.

What it costs

What goes into the price

Walnut Grove doesn't post its sewer permit and tap fees online; ask City Hall for the current schedule. The ranges below are national market figures, not our prices.

What moves the price

These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.

Free estimate: (678) 863-5620
  1. 01A road or highway bore, which the owner pays for
  2. 02Gravity line versus a grinder-pump station
  3. 03Testing an old line instead of replacing it
  4. 04Tank abandonment in the same visit

More about Walnut Grove

Shops and new subdivisions

Commercial and industrial connections get their own permit classes, and any industry producing process waste must meet EPA and EPD rules before it connects. Capacity is the bigger constraint: the current expansion covers roughly 24,000 gallons a day of business use, so ask the city about availability before signing a lease that assumes sewer.

When we abandon a tank as part of a conversion, the pumping is done by us: we're on Georgia DPH's approved pumper list for Walton County.

Commercial and industrial connections get their own permit classes, and any industry producing process waste must meet EPA and EPD rules before it connects.

Warning signs

Signs a Walnut Grove owner should plan a hookup

Seeing two or more of these? Call before it gets worse.

  • 1. A city letter saying sewer is available to your lot
  • 2. New sewer construction on your street
  • 3. A septic system on a lot under an acre that needs a new field
  • 4. An addition that would outgrow the existing tank

FAQ

Walnut Grove sewer installation questions

Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.

(678) 863-5620

Is Walnut Grove's connection rule different from Georgia's?

Yes. State rules use 200 feet. Walnut Grove's Sec. 42-21(d) requires connection when a public or proposed sewer is within 300 feet of the property line.

Source: City of Walnut Grove Code of Ordinances, Ch. 42, Art. II — Sewer System (Secs. 42-21, 42-23, 42-24)

How long do I have once sewer reaches my street?

Sixty days under Sec. 42-23(e). The septic tank then has to be cleaned of sludge and filled.

Source: City of Walnut Grove Code of Ordinances, Ch. 42, Art. II — Sewer System (Secs. 42-21, 42-23, 42-24)

Who pays to bore under the road to reach the main?

The owner. Sec. 42-24(c) lists boring under the entire road and surface restoration among the owner's costs.

Source: City of Walnut Grove Code of Ordinances, Ch. 42, Art. II — Sewer System (Secs. 42-21, 42-23, 42-24)

Can I keep using my old sewer pipe for a new house?

Only if it passes the superintendent's testing, such as a video inspection or pressure test, paid by the applicant.

Source: City of Walnut Grove Code of Ordinances, Ch. 42, Art. II — Sewer System (Secs. 42-21, 42-23, 42-24)

Can I build a new septic system instead?

Inside the city, not on a lot under one acre, and not once sewer is available within the connection distance.

Source: City of Walnut Grove Code of Ordinances, Ch. 42, Art. II — Sewer System (Secs. 42-21, 42-23, 42-24)

Is there room at the plant for my connection?

That's the city's call. The permitted plant is small, and the current expansion covers about 155 more homes, so confirm availability early.

Source: Walnut Grove Comprehensive Plan 2022-2026 (Georgia DCA)

Ready when you are

Got the 60-day letter? We'll plan the hookup.

Send your Walnut Grove address. We'll check the grade, price the bore and handle the tank.

(678) 863-5620
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Oxford, GA

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

Call nowFree Estimate