24/7 Emergency? (678) 863-5620

COMMERCIAL SEPTIC INSTALLATION · METRO ATLANTA

Commercial septic systems, designed for the load

A business lot past the end of the sewer main needs a system sized for its busiest hour, not a family's weekday. We start from Georgia's sewage flow schedule, work through the soil report, permit and inspection with the county, and install the tanks, pumps and field that the approved design calls for.
  • Georgia DPH-certified installer & pumper
  • Commercial properties
  • Emergency line answered 24/7

Get a free estimate

or call (678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

The short answer

How is a commercial septic system installed in Georgia?

A commercial septic system in Georgia is sized from the DPH Manual's Table 13.J flow schedule by seats, people, rooms or floor area, then permitted by the county Environmental Health office after a soil evaluation. Flows over 2,000 gallons per day need engineer-sealed plans, and the county inspects everything before it is covered.

Reviewed by Atlanta Water & Sewage Solutions · Last updated

Key facts

Commercial septic installation: the numbers that set the design

Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.

Georgia flow-schedule values, rule thresholds and county permit fees for new commercial on-site systems, each linked to its source.
TopicWhat it saysSource
Who permits itThe County Board of Health (Environmental Health) issues the construction permit and inspects before cover (511-3-1-.03)Georgia DPH Rules Chapter 511-3-1, On-Site Sewage Management Systems (Jan 2016), 2016
How flow is setDPH Manual Table 13.J, on peak flow, never long-term averages (511-3-1-.13)Georgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section J, Table 13.J Sewage Flow Schedule, 2026
Medical office200 gallons per day per exam roomGeorgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section J, Table 13.J Sewage Flow Schedule, 2026
Hotel or motel, no kitchenette100 gallons per day per room (150 with a kitchenette)Georgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section J, Table 13.J Sewage Flow Schedule, 2026
Grocery store200 gallons per day per 1,000 ft² of floor space, plus any food-service seatsGeorgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section J, Table 13.J Sewage Flow Schedule, 2026
Beauty salon150 gallons per day per chair, plus 20 per employeeGeorgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section J, Table 13.J Sewage Flow Schedule, 2026
Engineer thresholdFlow in excess of 2,000 gallons per day: plans and soil data sealed by a Georgia-registered engineer (511-3-1-.03(6))Georgia DPH Rules Chapter 511-3-1, On-Site Sewage Management Systems (Jan 2016), 2016
Installer certificationA commercial certification is required to install systems designed for 2,000 gpd or more (Manual Section N)Georgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section N Certification, 2026
Dosing tank triggerRequired on a conventional system needing more than 500 linear feet of absorption trenchGeorgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section F Dispersal Systems, Table 9.F and dosing tanks, 2026
New commercial permit fee$600 in Newton, Rockdale and Gwinnett (GNR); Walton inspections $550 (1–1,000 gpd) or $850 (1,001–2,000 gpd)GNR Environmental Health Fee Schedule — Newton County (effective Jan 1, 2026), 2026

Plain definitions

Terms you'll see on a commercial septic permit

Table 13.J
The Georgia DPH sewage flow schedule that assigns a daily flow in gallons to each type of facility, by seat, person, room, chair, exam room or floor area.
Percolation coefficient
A multiplier from Table 9.F of the Manual, based on how fast the soil absorbs water, that converts gallons per day into square feet of trench bottom for non-residential systems.
Additive flows
Georgia's rule that a building with more than one use adds the flows together, such as a store's floor-area flow plus the seats in its deli.
Replacement area
Unobstructed ground on the lot, at least equal in size to the initial field, held in reserve so a failed field can be rebuilt; the Manual's lot-sizing criteria call for it.
Pretreatment
Treatment ahead of the field that brings waste stronger than 200 mg/L of BOD5 and TSS down to that level before a conventional or chamber system receives it.

The whole story

What does Table 13.J say your building needs?

Every commercial design starts with one multiplication: the facility's unit count times its gallons per day from Table 13.J of the DPH Manual. The table is long, covering airports to veterinary offices, and it is blunt. It does not care that the office is quiet on Fridays or that the store is slow in January. Rule 511-3-1-.13 tells the health department to size on peak flow.

Here is how the arithmetic plays out for building types we get asked about, worked straight from the table and shown for scale only. A medical practice with six exam rooms comes to 1,200 gallons per day at 200 per room. A 20-room motel without kitchenettes lands at exactly 2,000. A shop with 30 workers and no showers is 750, and adding a break-room kitchen puts it at 900 because the table adds 5 gallons per worker. A strip of retail with 12,000 square feet of enclosed space is 1,200 at 100 per thousand square feet.

Mixed uses stack. The Manual's own note gives the case of a grocery store that also serves food: 200 gallons per thousand square feet of floor plus 50 per seat. A 10,000-square-foot market with a 20-seat deli therefore needs 2,000 plus 1,000, or 3,000 gallons per day, which moves the project into engineered design. A church with a weekday preschool, or a salon that shares a building with a dental office, is added up the same way.

The permit, not this page, sets your final design flow. An owner can also submit metered water records from an identical or similar operation, and the health department may weigh them, but it will not approve a design built on averages.

From our job files.

Worth knowing

Where does the 2,000-gallon line change the project?

Two separate rules meet at 2,000 gallons per day, and they are worded differently. Rule 511-3-1-.03(6) requires plans, specifications, soil data and absorption test data sealed by a Georgia-registered professional engineer when the flow is in excess of 2,000 gallons per day. At or below that figure, the county may accept plans from anyone it considers knowledgeable in system design.

The Manual's certification section draws its line at 2,000 gallons per day or more: the contractor who installs a system designed for that flow needs a commercial certification on top of the basic installer module. So the 20-room motel above, at exactly 2,000, may not need sealed plans but does need a commercially certified installer. Ask any contractor bidding a large system to show where that certification appears on the DPH list.

In practice, crossing the line adds an engineer's design fee and review time to the schedule, and often a more detailed site plan. It is worth knowing before a building is designed, because a few seats, rooms or exam rooms can decide which side of it a project falls on.

Two separate rules meet at 2,000 gallons per day, and they are worded differently.

Worth knowing

How long does a commercial drain field have to be?

For non-residential systems the Manual converts flow into trench with a formula in Section F: the percolation coefficient for the site's soil times the gallons per day gives the square feet of trench bottom, and dividing by the trench width gives linear feet. The coefficient comes from Table 9.F and rises as the soil gets slower.

An illustration: soil that percolates at 45 minutes per inch has a coefficient of 1.342. The six-exam-room medical office at 1,200 gallons per day would need about 1,610 square feet of trench bottom, which is roughly 805 linear feet if the design used a two-foot trench. That single number explains a lot about commercial sites. It is past the 500-foot mark where the Manual requires a dosing tank, so the system gains a pump, floats, controls and an alarm.

Clay makes it longer. Much of the east metro sits on Cecil and similar Piedmont soils, which the USDA describes as deep, well-drained red clay subsoil. A slower perc rate pushes the coefficient up and the trench out, and the replacement area has to fit on the lot as well. Check your parcel's mapped soils on the Web Soil Survey as a first look; the permit relies on the soil classifier's report.

From our job files.

Soil & terrain

Soil, slope and space on a business lot

Parking lots, drive aisles, dumpster pads and future building pads compete with the drain field for the same ground. The field cannot sit under pavement or traffic, and the Manual's lot-sizing criteria expect an equal-sized, unobstructed replacement area on top of the initial field.

The same criteria cap daily flow at 600 gallons per acre on a private well and 1,200 per acre on public water, and grow the minimum lot size in proportion when a building exceeds that. Walton County adopted those caps into a county ordinance. A 3,000 gpd building on public water therefore needs at least two and a half acres under the recommended criteria, before setbacks and slopes are subtracted.

  1. Cecil

    Very deep, well-drained Piedmont upland soil with a red clay subsoil; common across the east-metro counties.

  2. Your parcel

    Mapped soil units and ratings by area; a planning tool, not the soil report the permit relies on.

  3. Soil series · USDA NRCS

Your options

Commercial system types and when each fits

The approved design depends on flow, soil and what the waste contains. These are the families of systems Georgia recognizes; the county and, above 2,000 gpd, the engineer decide which one a lot gets.

OPTION 01

Conventional or chamber field with a septic tank

When it fits: Domestic-strength waste, enough suitable soil and room for the field plus the replacement area.

  • Simplest to operate
  • Lowest ongoing maintenance of the options
  • Needs the most ground
  • Longer fields require dosing, which adds a pump and alarm

OPTION 02

Conventional field with pretreatment ahead of it

When it fits: Kitchens, food prep or other waste above 200 mg/L BOD5 and TSS.

  • Protects the field from high-strength waste
  • Meets Rule .03(1)(c) before the tank discharges
  • Pretreatment equipment needs routine service
  • Design calculations are part of the permit package

OPTION 03

Aerobic treatment unit (ATU)

When it fits: Sites where a higher level of treatment is needed before dispersal.

  • Cleaner effluent to the field
  • Electrical equipment to maintain
  • ATUs for non-residential or high-strength waste are reviewed by the Georgia EPD

Per the Manual's Section D, ATU standards are written for domestic-strength waste; non-residential units get separate review.

OPTION 04

Drip or mound dispersal

When it fits: Shallow, slow or limited soils where a trench field will not fit.

  • Can work where a conventional field cannot
  • More components and a separate certification module for installers
  • Higher cost per gallon treated

How the job runs

From site visit to final inspection

Commercial installs follow the same state sequence as a house, with more calculation and more paperwork at each step.
  1. 1

    Count the load

    Seats, rooms, exam rooms, workers, floor area, kitchens and hours: everything Table 13.J needs to set a peak design flow. Call (678) 863-5620 to set up the free site visit.

    Georgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section J, Table 13.J Sewage Flow Schedule

  2. 2

    Look at the ground

    Walk the lot for the field and replacement area, away from paving, parking and planned additions, and pull the mapped soils.

    USDA NRCS Web Soil Survey

  3. 3

    Soil report

    A certified soil classifier evaluates the site. GNR counties have required a Level 3 soil report for septic permits since February 7, 2022.

    GNR Public Health — Septic Systems (Gwinnett, Newton & Rockdale)

  4. 4

    Design

    Tank, pretreatment, dosing and field sized from the flow and the percolation coefficient; sealed by an engineer when flow exceeds 2,000 gpd.

    511-3-1-.03(6); Manual Section FGeorgia DPH Rules Chapter 511-3-1, On-Site Sewage Management Systems (Jan 2016)

  5. 5

    Construction permit

    The county Environmental Health office reviews and issues the permit, which is valid for up to 12 months. We handle the application with the office.

    511-3-1-.03Georgia DPH Rules Chapter 511-3-1, On-Site Sewage Management Systems (Jan 2016)

  6. 6

    Install

    Tanks set level, pretreatment and dosing chambers plumbed, field lines built to the approved length and grade. We are on Georgia DPH's certified installer list.

    Georgia DPH Certified Septic Tank Installers list (9/18/2026)

  7. 7

    Inspection before backfill

    No system may be covered or used until the county's final inspection and written approval.

    511-3-1-.03(4)Georgia DPH Rules Chapter 511-3-1, On-Site Sewage Management Systems (Jan 2016)

  8. 8

    Start-up

    Backfill, final grade and a pump and alarm test, plus a plain-language rundown of what the system needs as the building fills up.

Permits & the Georgia rules

Georgia rules that govern a new commercial system

The state rule sets the frame and the county Environmental Health office runs the process and the fees.
  1. 01

    Calculate peak design flow from Table 13.J, adding flows for every use in the building.

  2. 02

    Obtain the soil evaluation the county requires (Level 3 in GNR counties).

  3. 03

    Submit the permit application with the site plan and, above 2,000 gpd, engineer-sealed plans and soil data.

  4. 04

    Show pretreatment for any waste stream above 200 mg/L BOD5 and TSS.

  5. 05

    Install under the permit and call for inspection before anything is backfilled.

Georgia rule 511-3-1-.13

Calculations will be made on the basis of peak flow and not on long term averages.
Read the rule

Georgia rule 511-3-1-.03(6)

If a proposed on-site sewage management system will produce a sewage flow in excess of two thousand gallons per day
Read the rule

Georgia rule Manual Section N

A commercial certification is required for contractors installing a system designed for a flow of 2,000 gallons per day or more.
Read the rule

How it varies by county

What it costs

What goes into the cost of a commercial septic system

Published installation prices are almost all residential. The ranges below are Georgia and Atlanta figures from Septic & Well Pro and Angi for systems of house scale, plus a tank supplier's commercial operating costs; a commercial system is usually larger than any of these and priced from its approved design.

What moves the price

These are published third-party typical market ranges (Septic & Well Pro 2026, Angi 2026, NTO Tank 2025), not our prices. Commercial systems are priced from the approved design; the on-site estimate is free.

Free estimate: (678) 863-5620
  1. 01Design flowEvery added seat, room or worker in Table 13.J adds tank volume and trench.
  2. 02Soil and perc rateSlower red-clay soils raise the percolation coefficient and lengthen the field.
  3. 03DosingPast 500 feet of trench, a dosing tank, pump, controls and alarm are required.
  4. 04EngineeringFlows over 2,000 gpd need sealed plans, which adds design fees and time.
  5. 05PretreatmentKitchens and other high-strength waste need treatment ahead of the field.
  6. 06Site constraintsPavement, setbacks and the replacement area decide where the field can go and how far effluent must travel.

Homes & businesses

New commercial system vs. a new home system

Residential

A new house

Sized by bedrooms: a 1,000-gallon tank covers one to four, with 250 gallons more for each additional bedroom, and the field comes from the bedroom-based table. The residential permit fee applies.

  • Bedroom sizing
  • Domestic waste
  • Residential fees

Commercial

A business, church or institution

Sized by use from Table 13.J, with a trench-length formula tied to the soil, pretreatment where waste is strong, dosing on long fields, commercial permit fees, and engineering and commercial installer certification at 2,000 gpd.

  • Use-based sizing
  • Peak flow, not averages
  • Engineer above 2,000 gpd
  • Replacement area on the lot
Commercial sewer, septic and water line services

FAQ

Commercial septic installation questions

Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.

(678) 863-5620

How do you size a septic system for a business in Georgia?

Multiply the facility's unit count by its gallons per day in Table 13.J of the DPH Manual, add every use in the building together, and design for that peak flow. The soil's percolation coefficient then turns gallons into trench length. The county permit sets the final figure.

Source: Georgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section J, Table 13.J Sewage Flow Schedule

When does a commercial septic system need an engineer in Georgia?

When its design flow is in excess of 2,000 gallons per day. Rule 511-3-1-.03(6) then requires the plans, specifications, soil data and absorption test data to carry a Georgia-registered engineer's seal. Smaller systems can be designed by someone the county considers qualified.

Source: Georgia DPH Rules Chapter 511-3-1, On-Site Sewage Management Systems (Jan 2016)

Does the installer need a special certification for a large system?

Yes. The DPH Manual's certification section says a commercial certification is required for contractors installing a system designed for 2,000 gallons per day or more. You can check any contractor against the DPH installer list before you sign.

Source: Georgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section N Certification

How much land does a commercial septic system need?

It depends on flow, soil and setbacks. The Manual's recommended lot-sizing criteria cap flow at 600 gallons per acre per day on a private well and 1,200 on public water, and require an equal replacement area. Walton County enforces those caps by ordinance.

Source: Georgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section M Recommended Lot Sizing Criteria

What does a commercial septic permit cost around east metro Atlanta?

GNR Public Health charges $600 for a commercial site evaluation, permit and initial inspection in Newton, Rockdale and Gwinnett. Walton charges $550 or $850 for new commercial inspections depending on flow, and DeKalb $400 or $600. Soil reports and engineering are separate.

Source: GNR Environmental Health Fee Schedule — Newton County (effective Jan 1, 2026)

Can a restaurant or deli be built on septic?

It can, with pretreatment. Food service is footnoted in Table 13.J because its waste often exceeds 200 mg/L BOD5 and TSS, and Rule .03(1)(c) requires that to be reduced before a conventional or chamber system. Restaurants open under 24 hours are sized at 50 gallons per seat.

Source: Georgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section J, Table 13.J Sewage Flow Schedule

Why does a commercial system need a pump when the lot slopes away from the building?

Length, not only elevation. The Manual requires a dosing tank on a conventional system that needs more than 500 linear feet of trench, so the whole field gets an even dose. Many commercial fields pass that length even on a favorable slope.

Source: Georgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section F Dispersal Systems, Table 9.F and dosing tanks

How long does a commercial septic installation take?

Plan for weeks, not days. The soil report, design, any engineering and the county's permit review all come before digging, and the county must inspect before backfill. The permit itself is good for up to 12 months, which gives room to schedule the dig around the building's opening.

Source: Georgia DPH Rules Chapter 511-3-1, On-Site Sewage Management Systems (Jan 2016)

Sources

Where these facts come from

Rules, costs and local facts on this page link to the agency, code or publisher that states them. Cost figures are third-party market ranges, not our prices — estimates are free.

Reviewed by Atlanta Water & Sewage Solutions · Last updated

  1. 1Georgia DPH Rules Chapter 511-3-1, On-Site Sewage Management Systems (Jan 2016) (2016)
  2. 2Georgia DPH Manual for On-Site Sewage Management Systems (March 2026) — Section J, Table 13.J Sewage Flow Schedule (2026)
  3. 3Georgia DPH Certified Septic Tank Installers list (9/18/2026) (2026)
  4. 4GNR Public Health — Septic Systems (Gwinnett, Newton & Rockdale)
  5. 5GNR Environmental Health Fee Schedule — Newton County (effective Jan 1, 2026) (2026)
  6. 6GNR Environmental Health Fee Schedule — Gwinnett County (effective Jan 1, 2026) (2026)
  7. 7Walton County EH Fees (Northeast Health District, effective August 1, 2024) (2024)
  8. 8Walton County Board of Health — Minimum Lot Size Ordinance
  9. 9Northeast Health District — Sewage/Septic Systems
  10. 10DeKalb Public Health Environmental Health Division Fee Schedule (effective January 1, 2024) (2024)
  11. 11DeKalb Public Health — Septic Systems
  12. 12USDA NRCS Official Soil Series Description — Cecil series (rev. Nov 2025) (2025)
  13. 13USDA NRCS Web Soil Survey
  14. 14Septic & Well Pro — Septic Installation Cost Georgia 2026 (updated June 9, 2026) (2026)
  15. 15Angi — Cost to Install a Septic System in Atlanta (2026 data) (2026)
  16. 16NTO Tank — Commercial Septic Tank Pricing: Business Owner Guide to Costs (March 11, 2025) (2025)

Ready when you are

Need commercial septic installation? Call the crew that digs.

A business lot past the end of the sewer main needs a system sized for its busiest hour, not a family's weekday. We start from Georgia's sewage flow schedule, work through the soil report, permit and inspection with the county, and install the tanks, pumps and field that the approved design calls for.

(678) 863-5620
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Oxford, GA

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

Call nowFree Estimate