or call (678) 863-5620The short answer
Sewer line installation in Conyers, GA
Conyers sewer belongs to Rockdale Water Resources, not the city. A new hookup starts with an RWR connection permit, then a private building sewer from your house to the cleanout at the right-of-way. Atlanta Water & Sewage Solutions lays that line, ties it in upstream of any old tank and closes the tank properly.↗↗↗
Reviewed by Atlanta Water & Sewage Solutions · Last updated
Sewer or septic?
Can your Conyers address get sewer at all?
The first question is whether Rockdale will accept an application at all. County code refuses a sewer application when any part of the parcel sits inside an area the Water and Wastewater Master Plan reserves for septic, so a lot on the fringe of Conyers can be told no even with a main in sight.↗
Where sewer is allowed, the state rule and the county rule push in the same direction. A tank that fails near an available main is usually replaced by a lateral, not a new drain field.↗
How to tell which one you have
- Look for a sewer line item on your RWR bill; water-only accounts are usually on a tank
- Find a manhole lid in the street or an easement behind the lot
- Ask RWR Engineering & Inspections at 770-278-7432 whether the parcel is in a septic-only area
Permits · Rockdale Water Resources (Engineering & Inspections, 1329 Portman Drive)
The Rockdale paperwork before a trench opens
- 01
Apply for a wastewater connection permit; RWR allocates capacity and collects the fees, including the capital cost recovery charge.↗
- 02
RWR engineering validates the permit. It is tied to that one project and cannot be transferred to another lot.↗
- 03
Request Georgia 811 locates so gas, power and cable are marked before excavation.↗
- 04
Build the private line to the cleanout at the right-of-way or easement limit; the owner keeps that cleanout afterward.↗
- 05
Tie in upstream of the tank, then pump the old tank and fill it with sand, gravel or dirt, or remove it.↗
Local facts
What Rockdale's construction standards say about new laterals
Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.
| Topic | What it says | Source |
|---|---|---|
| Pipe in the right-of-way | Sanitary sewer services inside the public right-of-way must be ductile iron pipe | Rockdale Water Resources — Water and Wastewater Standards and Specifications (Aug. 2019 update) |
| One house per lateral | Each service lateral may serve only one dwelling; developers of sewered subdivisions must stub a lateral to every lot | Rockdale Water Resources — Water and Wastewater Standards and Specifications (Aug. 2019 update) |
| Keep rainwater out | Downspouts, pools, dumpsters and similar drainage may not connect to the sanitary sewer | Rockdale Water Resources — Water and Wastewater Standards and Specifications (Aug. 2019 update) |
| Compaction under pavement | Backfill under roads compacted to 95% of Standard Proctor, with at least two density tests per sewer lateral | Rockdale Water Resources — Water and Wastewater Standards and Specifications (Aug. 2019 update) |
| Minimum cover on sewers | Not less than 2 feet; iron pipe required with under 4 feet or over 14 feet of cover | Rockdale Water Resources — Water and Wastewater Standards and Specifications (Aug. 2019 update) |
The Conyers story
Why a Conyers conversion is mostly a grade problem
Older houses on the fringe of town often flush into a tank behind the house, while the public main runs down the street out front. Converting means reversing the direction the plumbing was built to drain. A lot falling toward the road makes that easy; one falling away may need a deep cut near the foundation or a small private pump.
Granite under the red clay is the other wildcard. Rockdale's specs want pipe in rock bedded on clay or granular fill, so stone slows the trench.↗
Older houses on the fringe of town often flush into a tank behind the house, while the public main runs down the street out front.
What it costs
Installation cost ranges for a Conyers hookup
New sewer line installed
$40–$180 per linear foot
Typical market range — HomeGuide — Sewer Line Installation Cost (updated December 2025), 2025
New sewer line, total up to 40 feet
$1,600–$7,200
Typical market range — HomeGuide — Sewer Line Installation Cost (updated December 2025), 2025
Converting a septic tank to sewer
$3,000–$15,000
Typical market range — HomeGuide — Sewer Line Installation Cost (updated December 2025), 2025
Hooking up to a public sewer system
$1,000–$15,000
Typical market range — HomeGuide — Sewer Line Installation Cost (updated December 2025), 2025
Sewer cleanout installation
$500–$2,000
Typical market range — HomeGuide — Sewer Line Installation Cost (updated December 2025), 2025
RWR new-development sewer application
$200
Typical market range — Fees | Rockdale County Water Resources
What moves the price
These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.
Free estimate: (678) 863-5620- 01Distance from the house drain to the right-of-way cleanout
- 02Which way the lot falls, and whether a pump is needed
- 03Rock in the trench versus plain clay
- 04Pumping and filling or removing the abandoned tank
- 05Driveway or walk crossings that must be cut and replaced
More about Conyers
How we build a new building sewer in Rockdale
We shoot grades from the house drain to the stub first, because the fall of the pipe decides everything else. Then the locates are called in, the trench is cut, and pipe goes down on a bed at a steady slope with a cleanout where the line changes direction and at the right-of-way edge.
Before backfill we leave the pipe open for inspection. Afterward the tank is pumped by a certified pumper, then filled or pulled, so it cannot collapse under a mower later.↗
We shoot grades from the house drain to the stub first, because the fall of the pipe decides everything else.
Warning signs
Signs it is time to trade the tank for a lateral
Seeing two or more of these? Call before it gets worse.
- 1. The drain field stays soggy for days after every rain
- 2. The tank needs pumping far more often than it used to
- 3. A GNR repair permit would require a new field on a lot with little usable soil
- 4. A neighbor just connected, or a main now runs in the street out front
More about Conyers
Single homes versus shops and new subdivisions
A residential conversion is one lateral, one permit and usually a day or two in the yard. Commercial sites along the I-20 corridor are a larger exercise. RWR's standards call for a Georgia-licensed engineer's conveyance capacity certificate on development projects, showing the downstream lines can carry the new peak flow.↗
Subdivisions add capped stubs to every lot, each recorded on the as-built drawings. We build the private sewers joining those stubs to finished homes.↗
A residential conversion is one lateral, one permit and usually a day or two in the yard.
FAQ
Conyers sewer installation questions
Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.
(678) 863-5620Who do I call to start a sewer connection in Conyers?
Rockdale Water Resources. Its Engineering & Inspections office at 1329 Portman Drive handles connection questions at 770-278-7432; the City of Conyers does not run the sanitary sewer.
Source: Contact Information | Rockdale County Water Resources
Does the 200-foot rule mean I must connect right away?
Georgia requires connection when sewer is within 200 feet or in an abutting right-of-way. In practice the push usually comes when a septic system fails, because Rockdale then gives 30 days after written notice to connect.
Source: Ga. Comp. R. & Regs. 511-3-1 On-Site Sewage Management Systems
Can two houses share one new sewer lateral?
No. Rockdale's standards say each individual service lateral must serve only one dwelling, so a guest house or second home on the lot needs its own arrangement.
Source: Rockdale Water Resources — Water and Wastewater Standards and Specifications (Aug. 2019 update)
I read that Newton County customers own the line all the way to the main. Is that true in Conyers?
That rule belongs to NCWSA, which moved the owner's upkeep to the tap in 2021. Rockdale draws the line at the street right-of-way instead, so the county keeps the service line between the main and that point.
Source: NCWSA — Notice of Policy Change: Maintenance of Sewer Service Laterals (July 14, 2021)
What happens to my old septic tank?
The new line is connected upstream of the tank. The tank is then pumped out and filled with sand, gravel or dirt, or removed entirely.
Source: Rockdale County Code, Ch. 98, Art. III, Div. 6 Private Wastewater Disposal Facilities (Municode)
How much does a septic-to-sewer conversion cost?
HomeGuide's 2025 national range is $3,000 to $15,000, before Rockdale's own charges. We price your lot free on site.
Source: HomeGuide — Sewer Line Installation Cost (updated December 2025)
Nearby areas
Sewer line installation around Conyers
- Covington septic & sewerCity of Covington taps and Municode connection rules, east on I-20
- Oxford septic & sewerNew laterals in the college town north of Covington
- Porterdale septic & sewerHookups in the Yellow River mill town downstream
- Stonecrest septic & sewerDeKalb County sewer connections just west of the county line
- Lithonia septic & sewerDeKalb hookups near Arabia Mountain
Sources
Where these facts come from
Rules, costs and local facts on this page link to the agency, code or publisher that states them. Cost figures are third-party market ranges, not our prices — estimates are free.
Reviewed by Atlanta Water & Sewage Solutions · Last updated
- 1Rockdale County Code, Ch. 98, Art. III, Div. 2 Wastewater Application and Connection Process; Fees (Municode)
- 2Rockdale County Code of Ordinances, Ch. 98, Art. I, Div. 1 (Municode, Supp. 47)
- 3Rockdale County Code, Ch. 98, Art. III, Div. 6 Private Wastewater Disposal Facilities (Municode)
- 4Ga. Comp. R. & Regs. 511-3-1 On-Site Sewage Management Systems
- 5Georgia 811 — Laws & Policies (Georgia Underground Facility Protection Act, O.C.G.A. 25-9)
- 6Fees | Rockdale County Water Resources
- 7Rockdale Water Resources — Water and Wastewater Standards and Specifications (Aug. 2019 update)
- 8HomeGuide — Sewer Line Installation Cost (updated December 2025)
- 9Contact Information | Rockdale County Water Resources
- 10NCWSA — Notice of Policy Change: Maintenance of Sewer Service Laterals (July 14, 2021)

Ready when you are
Main in the street, tank in the back yard? LET'S RUN THE GRADES.
Send us the address. We check whether Rockdale will take the connection, walk the slope from your drain to the right-of-way and give you a free installed price.
(678) 863-5620- Georgia DPH-certified installer & pumper