24/7 Emergency? (678) 863-5620
Open trench across a craftsman bungalow's front yard with old terracotta clay sewer pipe beside new white PVC pipe; illustrating sewer line installation for Oxford, Georgia

Sewer Line Installation & Replacement · Oxford, GA

Sewer line installation in Oxford, Georgia, for homes switching from a septic tank to the city sewer.

Oxford, Newton County · about 16 min / 8.6 mi by road from our Oxford shop. ZIP code 30054.
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Local shop in Oxford, GA

Get a free estimate

or call (678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

The short answer

Sewer line installation in Oxford, GA

Oxford requires a home within 100 feet of a street or easement holding a public sewer to connect at the owner's expense, and gives 120 days to pay the tap-in fee once a new line is accepted. We build the private building sewer from your house to the city connection, then help close out the old septic tank.

Reviewed by Atlanta Water & Sewage Solutions · Last updated

At a glance

County
Newton County
ZIP codes
30054
Sewer
City of Oxford (municipal sewer)
Water
City of Oxford (distributes water purchased from the Newton County Water and Sewer Authority)
From our shop
about 16 min / 8.6 mi by road from our Oxford shop
Population
1,770 (ACS 2020-2024 5-year, table B01003)

Sewer or septic?

An Oxford house can still be on a tank

Oxford's own storm water page admits the job is unfinished: the city is working toward putting every residence on sanitary sewer and asks the rest to keep their septic systems healthy. That leftover group is who calls us about a new line.

Once connected, your flow joins a split system. The 2024 county water analysis reports roughly a third of Oxford's wastewater heading to Covington's plant and the rest to NCWSA's Yellow River plant.

How to tell which one you have

  • Your bill shows a sewer line item charged on water usage
  • A manhole sits in the street, alley or an easement near your lot
  • There is a tank lid or a pair of cleanouts in the yard and no sewer charge

Permits · City of Oxford (Code of Ordinances, Chapter 36, Article IV)

How Oxford's hookup ordinance plays out

Chapter 36 of the city code sets the sequence. We follow it rather than guess.
  1. 01

    The trigger: a dwelling or main building within 100 feet, measured from the structure to the right-of-way line, of a street, alley or easement with a public sewer.

  2. 02

    The clock: 120 days from when a newly built public sewer is accepted by the city to pay the tap-in fee and request a connection date.

  3. 03

    The deferral: a working system can delay the hookup five years if a septic contractor certified by the state health department signs off, renewed every five years.

  4. 04

    The permit: the owner applies to the city for a building sewer permit and pays the permit and inspection fee before anyone opens the public sewer.

  5. 05

    The closeout: at connection, the old tank or cesspool is pumped of sludge and filled with suitable material.

Georgia rule Oxford Code § 36-95(c)

All costs and expenses incidental to the installation and connection of the building sewer shall be borne by the owner.
Read the rule

The Oxford story

What we actually build between your wall and the main

The pipe we install is the building sewer: from the point where the house drain leaves the foundation out to the city connection. On most converted Oxford lots the old plumbing exit points toward the tank, often in the back or side yard, so the new line has to turn and head for the street.

Grade decides the route. The code wants the sewer to arrive below the lowest floor where possible, and a house whose drain sits too low for gravity needs an approved lift, typically a small ejector pump, discharging into the building sewer.

Every building gets its own sewer. The one exception covers a rear building on an interior lot with no other route, which may share the front building's line at the owner's risk.

On the record

  • Oxford's code requires a pump or other approved lift wherever a building drain is too low to reach the public sewer by gravity.
  • The Mayor and Council may adjust sewer tap-in fees or payment schedules for residents who meet the city's economic-hardship measures.

What it costs

Budgeting an Oxford conversion

Oxford sets its tap-in fee by council action and does not post it online, so ask City Hall for the current figure. The ranges below are published national market numbers, not our prices.

What moves the price

These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.

Free estimate: (678) 863-5620
  1. 01How far the house sits from the street, since the city rule reaches houses up to 100 feet back
  2. 02Whether the drain exits toward the back yard and the line must wrap around the house
  3. 03A lift pump for a low crawlspace or basement drain
  4. 04Filling the retired tank and restoring the yard over it

Warning signs

Signs it is time to stop nursing the tank

In Oxford, a failing tank near sewer is no longer a repair decision.

Seeing two or more of these? Call before it gets worse.

  • 1. The system is failing or needs work costing more than half of what replacement or connection would
  • 2. A city letter says a sewer line has been accepted on your street
  • 3. You are adding a bedroom or bath and the tank is already undersized
  • 4. You are selling and want the septic question settled before inspection

More about Oxford

Houses, college rentals and small commercial buildings

A single-family hookup is usually a few days of trench work plus the tank closeout. The city permits residential and commercial building sewers under the same class, but a shop, church hall or multi-unit rental near the college may need a bigger pipe, more cleanouts and a tighter schedule around tenants.

Downspouts, foundation drains and yard drains cannot be tied into the new line unless the superintendent approves, so we route roof water away from the building sewer when we dig.

A single-family hookup is usually a few days of trench work plus the tank closeout.

FAQ

Oxford sewer installation questions

Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.

(678) 863-5620

How close does the sewer have to be before Oxford makes me connect?

One hundred feet, measured from your house or main building to the right-of-way line of a street, alley or easement containing a public sewer. That is stricter than the state's 200-foot property-line test.

Source: Oxford, GA Code of Ordinances § 36-93, Use of public sewers required (Municode, Supp. 9)

How long do I have after the city accepts a new sewer line?

The code gives 120 days to pay the city tap-in fee and ask for a connection date. If the septic system fails during that window, the connection is required immediately.

Source: Oxford, GA Code of Ordinances § 36-94, Private wastewater disposal (Municode, Supp. 9)

My septic tank works fine. Can I put off the hookup?

Yes, for five years at a time. You give the City Clerk documented evidence, signed by a septic contractor certified by the state health department, that the system meets health standards, and you resubmit every five years.

Source: Oxford, GA Code of Ordinances § 36-93, Use of public sewers required (Municode, Supp. 9)

Can I keep repairing my septic system instead of connecting?

Not where sewer is available. The ordinance bars repairs, alterations or extensions to a private system once public sewer lines are available to it.

Source: Oxford, GA Code of Ordinances § 36-93, Use of public sewers required (Municode, Supp. 9)

What happens to the old tank?

It is cleaned of sludge and filled with suitable material at the time of connection, following city, county or state health codes.

Source: Oxford, GA Code of Ordinances § 36-94, Private wastewater disposal (Municode, Supp. 9)

Does NCWSA's 2021 lateral policy apply to Oxford homes?

Not to city customers. Since March 1, 2021, NCWSA's own customers pay to clear their building sewer through the tap at the main. Oxford runs its own collection system, so its code, not NCWSA's, governs your new line inside city limits.

Source: NCWSA — Notice of Policy Change: Maintenance of Sewer Service Laterals (July 14, 2021)

Ready when you are

Got the city's sewer letter in Oxford? WE'LL WALK THE ROUTE WITH YOU.

Tell us where the tank is and where the nearest manhole sits. We will map the line, price the hookup and tank closeout on site at no charge.

(678) 863-5620
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Oxford, GA

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

Call nowFree Estimate