Septic permits & records
Lamar County Environmental Health (District 4 Public Health)
- Address
- 100 Academy Drive, Barnesville, GA 30204
- Hours
- Monday-Friday 8 a.m.-5 p.m.; closed for lunch 12-1 p.m.
Serving metro Atlanta from Oxford, GA
Georgia DPH-certified septic installer & pumper24/7 Emergency? (678) 863-5620
Lamar County · Septic & sewer rules
Get a free estimate
or call (678) 863-5620The short answer
Mostly septic. The City of Barnesville owns the county's water and sewer lines and its only municipal sewage plant, and its sewer reaches the town and nearby suburbs. Rural tracts and scattered subdivisions use septic, permitted by Lamar County Environmental Health, a District 4 office in Barnesville. We install, repair and pump systems countywide.↗↗
Reviewed by Atlanta Water & Sewage Solutions · Last updated
Sewer or septic?
Lamar's plan draft does not mince words: the water and sewer infrastructure is owned by the City of Barnesville and needs upgrades before more development should happen. The county's suburban neighborhoods around Barnesville and Milner are tied into city water and sewer, while its rural residential areas have limited service.↗
The same plan notes that small subdivisions on individual septic systems have been built all over the county. Federal permit records back that up: there is exactly one municipal sewage plant in Lamar, on Gordon Road in Barnesville, and none for Milner or Aldora.↗↗
Who to call at the county
Septic permits & records
Local facts
Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.
| Topic | What it says | Source |
|---|---|---|
| Septic permits | 100 Academy Drive, Barnesville; (770) 358-1483 ext. 2; weekdays 8-5, closed noon to 1 | District 4 Public Health: Lamar County (Health Department and Environmental Health) |
| Replacement field | Every subdivision lot needs soil for a primary and a replacement conventional system | Lamar County Development Regulations Sec. 501: General design standards (Municode) |
| Major subdivision lots | At least 2 acres, with each septic system shown on the plat | Lamar County Development Regulations Sec. 501.1: Major subdivisions (Municode) |
| A-R district minimum | Set by the health department, never under 5 acres | Lamar County Zoning Sec. 505: A-R district standards (Municode) |
| Median year built / mobile homes | 1988 / 1,366 of 7,866 housing units, about 17% | Census Reporter: Lamar County, GA (ACS 2024 5-year) |
| County created | 1920, from parts of Monroe and Pike, named for L.Q.C. Lamar | New Georgia Encyclopedia: Lamar County |
| Population | 18,500 (2020 Census) | Wikipedia: Lamar County, Georgia |
The Lamar County story
Lamar was carved from Monroe and Pike only in 1920, and a century later it is still mostly country. The plan draft describes rural residential lots of at least an acre and often five or more, and the farm district will not go below five acres whatever the soil says.↗↗↗
Those big lots are a septic contractor's friend. The county's development rules demand that each lot carry enough usable soil for the field it needs today and a full replacement field tomorrow, and they forbid any system from crossing a lot line. When a Lamar field fails after twenty years, there is supposed to be clean ground waiting for the next one.↗
Residents know the pinch. When the county surveyed them for the plan, two-thirds named water and sewer infrastructure as a priority.↗
Permits · Lamar County Environmental Health, District 4 Public Health
Get health department approval of the water supply and sewage disposal before the county issues a building permit; no utility hookup is made to a site without one.↗
File District 4's new-system application with the lot sketch, bedrooms, water source and plumbing stub-out location.↗
On a new subdivision lot, show the primary field and a replacement area; neither may cross a lot line.↗
Call for the inspection before cover; repairs follow the same state rule.↗
Georgia rule 511-3-1-.03(1)
“available within two hundred feet (200') of the property line”
Soil & terrain
A line running roughly through Orchard Hill, Milner and Barnesville splits Lamar in two: the western third drains to the Flint, the rest to the Ocmulgee. Soils on both sides are mostly Cecil, from gently sloping sandy loam to severely eroded clay loam on the hillsides.↗↗
Lamar's share of the three-county soil survey shows no acreage at all rated free of septic limitations. Frequently flooded Wehadkee bottoms along the creeks are the worst places for a field.↗
More about Lamar County
Barnesville's water plant, fed from the Towaliga, supplies the city, Milner and the surrounding county, and stores it in tanks on Hog Mountain. A county authority exists on paper under a 1989 act, but federal records show its own water system as inactive, so most county homes with public water are city customers.↗↗
Towns we serve
Services here
Also available:Septic InspectionEmergency Septic & Sewer Service
FAQ
Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.
(678) 863-5620From Lamar County Environmental Health, part of District 4 Public Health, at 100 Academy Drive in Barnesville. Call (770) 358-1483 and ask for extension 2; the office is open weekdays 8 to 5 and closes from noon to 1.
Source: District 4 Public Health: Lamar County (Health Department and Environmental Health)
Not in practice. The county plan draft says the water and sewer infrastructure is owned by the City of Barnesville, and EPA lists only one municipal sewage plant in the county, Barnesville's.
Source: Lamar County Comprehensive Plan 2024-2044 (draft, Feb. 19, 2024)
County development rules say a suitable lot must contain enough usable soil for a primary conventional septic system and a replacement conventional system, so a failed field can be moved to fresh ground.
Source: Lamar County Development Regulations Sec. 501: General design standards (Municode)
In the A-R district the health department sets the minimum, but it can never be less than 5 acres, with at least 300 feet of lot width.
Source: Lamar County Zoning Sec. 505: A-R district standards (Municode)
No. Lamar's zoning says the health department must approve the water supply and sewage disposal first, and no electric, water or sewer hookup is made to new construction without a building permit.
Source: Lamar County Zoning Sec. 404: Building permits required (Municode)
Not easily. In Lamar's portion of the regional soil survey, about 91,100 acres are rated somewhat limited and 24,800 very limited for absorption fields, and none are rated without limitations.
Mostly the City of Barnesville, whose plant serves the city, Milner and surrounding parts of the county. Milner resells that water to its own customers.
Sources
Rules, costs and local facts on this page link to the agency, code or publisher that states them. Cost figures are third-party market ranges, not our prices — estimates are free.
Reviewed by Atlanta Water & Sewage Solutions · Last updated