24/7 Emergency? (678) 863-5620
Trench at the curb of a suburban Georgia street where a new white PVC sewer lateral connects to the main; illustrating sewer line installation for Rex, Georgia

Sewer Line Installation & Replacement · Rex, GA

Sewer line installation and replacement in Rex, Georgia, under a CCWA building sewer permit with county inspection.

Rex, Clayton County · about 50 min / 29.3 mi by road from our Oxford shop. ZIP code 30273.
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Local shop in Oxford, GA

Get a free estimate

or call (678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

The short answer

How does sewer line installation work in Rex, GA?

A new or replacement sewer line in Rex needs a building sewer permit from the Clayton County Water Authority, with the fee paid at application. The owner pays every installation cost, the county building inspector supervises the connection and test, and CCWA won't start service until fees are paid and the connection passes.

Reviewed by Atlanta Water & Sewage Solutions · Last updated

At a glance

County
Clayton County / Henry County
ZIP codes
30273
Sewer
Clayton County Water Authority (CCWA)
Water
Clayton County Water Authority (CCWA)
From our shop
about 50 min / 29.3 mi by road from our Oxford shop
Population
17,844 (ACS 2020-2024 5-year, table B01003 (ZCTA 30273, not a place))

Permits · Clayton County Water Authority, with the Clayton County building inspector

The Clayton permit sequence for a new building sewer

Sec. 98-5 of the county code lays this out; the order matters.
  1. 01

    Confirm sewer is available and get a fee estimate from CCWA's Engineering Section, which quotes connection, tap and meter charges per property.

  2. 02

    Apply on CCWA's form for one of two permit classes: residential and commercial service, or industrial waste.

  3. 03

    Pay the permit fee to CCWA when the application is filed, along with any plans or specs the manager asks for.

  4. 04

    Build the line to the plumbing and building codes in force in Clayton, with joints gas-tight and watertight.

  5. 05

    Notify the county building inspector when the line is ready; connection and testing happen under the inspector's supervision.

  6. 06

    Service begins only after CCWA's fees are paid and the inspector approves the connection.

The Rex story

Three rules that shape a Rex sewer layout

First, one building, one sewer. The ordinance calls for a separate, independent building sewer for every building, and for each unit of a multi-unit residence, unless CCWA approves otherwise. A detached garage apartment or a second house on the lot generally gets its own line.

Second, clean water stays out. No one may tie roof downspouts, foundation drains, areaway drains or other groundwater and surface runoff into a building sewer without CCWA's approval. On sloped Rex lots it's tempting to route a French drain into the nearest pipe; this rule says don't.

Third, the cost and the pipe are yours for good. The owner pays every expense of installing and connecting the building sewer and indemnifies CCWA against damage from the work, and the finished line becomes the landowner's property and responsibility.

  • Clayton's code requires a separate building sewer for every building and every residential unit of a multi-unit home unless CCWA approves otherwise.
  • Downspouts, foundation drains and areaway drains may not connect to a building sewer without CCWA approval.

First, one building, one sewer.

More about Rex

Where installation jobs come from in Rex

Brand-new houses are only part of it. ZIP 30273 added 1,975 homes in the 2000s and 428 more in the 2010s, but the bigger pool is replacement: the 3,500-plus houses from the 1970s through the 1990s whose laterals are reaching the point where patching stops making sense.

The other source is a home that was never on sewer. Clayton's code says that when a public line becomes reasonably available to a property with a septic system, the owner must connect within 30 days after notice, and the old tank must be cleaned of sludge and filled. Where CCWA's sewer runs within 200 feet of the property line, the same 30-day clock applies.

Trenching in Rex is mostly kind. The Madison soil mapped in the center of the community is very deep and well drained, so a four-foot trench usually stays in clay. Its heavy mica content makes the spoil slick when wet, which matters for compaction and for keeping a trench wall standing.

On the record

  • ZIP 30273 gained 1,975 housing units in 2000–2009 and 428 in 2010–2019 (ACS table B25034).

Who owns what

What you're installing, and what CCWA already owns

Cross-section: house, building drain, sewer lateral, cleanout, property line, tap and public sewer mainSTREETPROPERTY LINECLEANOUTTAPPUBLIC SEWER MAINSEWER LATERALBUILDING DRAINPROPERTY OWNERUTILITY
Green = sewer (APWA uniform color code)Typical handoff here: Property line
  • Clayton County Water Authoritysewer lateral

    Owner installs and keeps the four-inch private line to the connection

    Where the line sits: Point of connection

  • Clayton County Water Authoritysewer tap

    No one may open or connect to a public sewer without a written permit from CCWA's manager

    Where the line sits: Public sewer

What it costs

Installation cost references

Third-party ranges, not our prices. CCWA's own connection and tap fees are quoted per property and are separate.

What moves the price

These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.

Free estimate: (678) 863-5620
  1. 01Run length from a set-back house down to the street
  2. 02A second building needing its own line
  3. 03Rerouting downspouts or foundation drains that were tied in
  4. 04Filling a retired septic tank

FAQ

Rex sewer installation FAQ

Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.

(678) 863-5620

Do I need a permit to replace my sewer line in Rex?

Yes. Opening, connecting to or altering a public sewer requires a written permit from CCWA, and the building sewer permit is applied for on CCWA's form with a fee.

Source: Clayton County Code Ch. 98, Art. II — Water Authority Sewer Use (Municode, Supp. 105)

Who inspects a new sewer connection in Rex?

The Clayton County building inspector. The permit holder calls for inspection when the line is ready, and the connection and testing are done under the inspector's supervision.

Source: Clayton County Code Ch. 98, Art. II — Water Authority Sewer Use (Municode, Supp. 105)

What does CCWA charge to connect?

CCWA doesn't post connection or tap fees. Its Engineering Section at 770-960-5207 estimates them for a specific property.

Source: Engineering / Developer Information | Clayton County Water Authority, GA

Can my gutters drain into the new sewer line?

No, not without CCWA's approval. The county code bars downspouts, foundation drains and similar runoff connections to a building sewer.

Source: Clayton County Code Ch. 98, Art. II — Water Authority Sewer Use (Municode, Supp. 105)

I have a guest house. Can it share my sewer line?

Normally each building needs its own separate building sewer unless CCWA approves a shared one. Ask before you design.

Source: Clayton County Code Ch. 98, Art. II — Water Authority Sewer Use (Municode, Supp. 105)

If sewer reaches my Rex property, how fast must I connect?

Within 30 days after official notice when the line is within 200 feet of the property line. A septic tank you're retiring must be emptied of sludge and filled.

Source: Clayton County Code Ch. 98, Art. II — Water Authority Sewer Use (Municode, Supp. 105)

Who owns the new line once it's in?

You do. Building sewers are the landowner's property and responsibility; CCWA has no ownership in them.

Source: Clayton County Code Ch. 98, Art. II — Water Authority Sewer Use (Municode, Supp. 105)

Ready when you are

Building or replacing in Rex? We'll run the line and meet the inspector.

Call (678) 863-5620 to plan a new or replacement building sewer on CCWA's system.

(678) 863-5620
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Oxford, GA

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

Call nowFree Estimate