24/7 Emergency? (678) 863-5620
Trench at the curb of a suburban Georgia street where a new white PVC sewer lateral connects to the main; illustrating sewer line installation for Decatur, Georgia

Sewer Line Installation & Replacement · Decatur, GA

Decatur sewer line installation and replacement for renovations, teardown rebuilds and new homes.

Decatur, DeKalb County · about 42 min / 30.8 mi by road from our Oxford shop. ZIP codes 30030, 30033, 30307, 30317.
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Local shop in Oxford, GA

Get a free estimate

or call (678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

The short answer

What does it take to install or replace a sewer line in Decatur, GA?

A Decatur sewer line replacement is a private-side job: the owner pays to lay a new building sewer from the house to DeKalb County's connection, under a licensed plumbing permit. New homes and teardown rebuilds also need DeKalb Watershed's sewer capacity sign-off before a building permit is issued.

Reviewed by Atlanta Water & Sewage Solutions · Last updated

At a glance

County
DeKalb County
ZIP codes
30030, 30033, 30307, 30317
Sewer
DeKalb County Department of Watershed Management
Water
DeKalb County Department of Watershed Management
From our shop
about 42 min / 30.8 mi by road from our Oxford shop
Population
24,518 (ACS 2020-2024 5-year, table B01003)

The Decatur story

Decatur keeps building on old lots

Decatur has grown upward and inward rather than outward. The city is only 4.6 square miles, yet the census counts 2,145 homes built between 2010 and 2019 and another 316 since 2020. Almost all of that went onto lots that already had a house, a lateral and a tap.

That is when replacement makes sense. A renovation that adds bathrooms, a teardown that puts a larger house on the footprint, or an addition built over the old sewer path all call the existing line into question. Reusing a century-old lateral under a brand-new house saves money only until it fails under new flooring.

The other large group is multifamily. About a quarter of Decatur's housing units are in buildings with 50 or more apartments, and those buildings carry bigger building sewers and commercial-grade connection reviews.

  • 2,145 Decatur housing units were built in 2010–2019 and 316 more in 2020 or later (ACS 2020-2024, table B25034).
  • 2,711 of Decatur's 10,684 housing units (25%) are in buildings of 50 or more units (ACS table B25024).

Decatur has grown upward and inward rather than outward.

Permits · DeKalb County Watershed Management and DeKalb Planning & Sustainability

Permits for a new or replaced Decatur lateral

Decatur's water and sewer belong to DeKalb, so the county's connection rules apply.
  1. 01

    For a new single-family detached home on sewer, DeKalb requires a Sewer Capacity Evaluation, and no building permit issues until Watershed signs off.

  2. 02

    A DeKalb sewer connection permit grants only the right to connect at the owner's expense; a stub at the property is not guaranteed.

  3. 03

    A licensed plumbing or sewer contractor pulls the plumbing permit before the private building sewer is laid.

  4. 04

    The owner pays all installation and connection costs and answers for any damage the work does to the public sewer.

Published fees

  • DeKalb sewer access fee, residentialEffective 2022 rate sheet$1,811.93

Local facts

Ground conditions for a Decatur trench

Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.

What we expect to dig through, and where.
TopicWhat it saysSource
Soil series at the centerCecil: very deep, bedrock more than 60 inches downOfficial Series Description — CECIL Series (USDA NRCS)
Main ZIP30030 covers nearly all of the city's landU.S. Census Bureau 2020 ZCTA-to-Place Relationship File
Homes from the 1940s1,085 units, on top of 2,428 from 1939 or earlierCensus Reporter: Decatur, GA (ACS 2024 5-year, tables B25034, B25024)

More about Decatur

How we lay a new line in town

We film the old line first, even on a teardown. The camera shows where the existing lateral meets the county connection, how deep it is, and whether the right-of-way piece looks sound, which is DeKalb's side to deal with.

Deep Cecil clay trenches cleanly, so the challenges are above ground: foundations, retaining walls, protected trees and a neighbor's driveway a few feet away. We set grade from the house drain to the connection point, bed the pipe, install a cleanout where the line leaves the house and another near the right-of-way, then test before backfill.

For buildings with many units the sequence is the same but the pipe is larger and the county review is heavier. Those projects start with the engineer's plan and DeKalb's capacity answer before a shovel goes in the ground.

We film the old line first, even on a teardown.

What it costs

Published cost ranges for Decatur sewer installs

Industry and market ranges, not our quotes, plus DeKalb's published fee.

What moves the price

These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.

Free estimate: (678) 863-5620
  1. 01Length from the house drain to the county connection
  2. 02Hardscape, walls and trees along the route
  3. 03Whether a new tap or access fee applies
  4. 04Pipe size for duplexes and multifamily buildings

FAQ

Decatur sewer installation FAQ

Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.

(678) 863-5620

Do I need DeKalb's approval to build a new house on sewer in Decatur?

Yes. DeKalb requires a Sewer Capacity Evaluation for new single-family detached homes on sewer, and the building permit waits on Watershed's sign-off.

Source: DeKalb County Planning & Sustainability — Watershed Packet (revised 5/6/25)

Does a sewer connection permit mean there's a stub at my lot?

No. DeKalb's packet says the connection permit gives only the right to connect at your expense and does not guarantee a stub.

Source: DeKalb County Planning & Sustainability — Watershed Packet (revised 5/6/25)

What does DeKalb charge to access the sewer system?

The county's 2022 rate sheet lists a residential sewer access fee of $1,811.93 for new connections. Replacing your own lateral on an existing connection is a different job.

Source: DeKalb County 2022 Current Rates — Water and Sewer Rates and Service Charges (via Wayback)

Should I replace the sewer line during a Decatur renovation?

If the camera shows roots, offsets or mixed materials, doing it while walls and floors are open is usually cheaper than later. Many Decatur homes predate 1950.

Source: Census Reporter: Decatur, GA (ACS 2024 5-year, tables B25034, B25024)

Who pays for the new building sewer?

The owner pays all costs of installing and connecting it, and for any damage the work causes to the public sewer, under DeKalb Code Sec. 25-215.

Source: DeKalb County Code Ch. 25, Art. IV, Div. 3 — Building Sewers and Connections (Municode, Supp. 72)

Is there rock to blast in Decatur?

Not usually. Cecil, the soil mapped at the city center, is very deep, with bedrock more than 60 inches below the surface.

Source: Official Series Description — CECIL Series (USDA NRCS)

Ready when you are

Rebuilding in Decatur? Replace the lateral while the ground is open.

Call (678) 863-5620 to scope a new building sewer to DeKalb's connection.

(678) 863-5620
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Oxford, GA

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

Call nowFree Estimate