or call (678) 863-5620The short answer
What's involved in a new or replacement sewer line in Ellenwood, GA?
In Ellenwood the owner installs and pays for the private building sewer, then connects it to DeKalb, Clayton County Water Authority or Henry County Water Authority sewer depending on the county. DeKalb-side projects need a licensed plumbing permit, and many businesses such as larger day cares must be on sewer rather than septic.↗↗↗
Reviewed by Atlanta Water & Sewage Solutions · Last updated
At a glance
The Ellenwood story
When Ellenwood properties need a new line
Ellenwood is overwhelmingly single-family: about 89 percent of the housing units in 30294 are detached houses. It also counts 711 mobile homes, and swapping one for a site-built house is a natural moment to look hard at how the lot drains.↗
Businesses bring the harder cases. In November 2025 DeKalb Public Health reviewed a child day care proposed at 4493 Flakes Mill Road in Ellenwood and noted that county health regulations prohibit on-site sewage systems for day cares with more than six clients. The same list covers food service, multifamily buildings, schools and personal care homes with more than six clients. A property changing to one of those uses needs a sewer connection.↗
Homeowners replace laterals for simpler reasons: repeated failures, an addition over the old route, or a line that was never laid on a proper grade.
Ellenwood is overwhelmingly single-family: about 89 percent of the housing units in 30294 are detached houses.
Permits · DeKalb County Watershed Management / Planning & Sustainability
Connection steps on the DeKalb side
- 01
A DeKalb sewer connection permit gives the right to connect at the owner's expense; it doesn't promise a stub at the lot.↗
- 02
A licensed sewer or plumbing contractor must hold a plumbing permit before the private building sewer goes in.↗
- 03
The owner pays every cost of installing and connecting the building sewer and any damage to the public line.↗
- 04
Any change that alters wastewater flow to an existing on-site system must be reviewed by DeKalb Public Health before construction.↗
Published fees
- DeKalb sewer access fee, residential (new connection)Effective 2022 rate sheet$1,811.93↗
Local facts
Site conditions we plan around
Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.
| Topic | What it says | Source |
|---|---|---|
| Cleanout (Clayton side) | CCWA requires a cleanout on every lateral near the right-of-way and may require another at the building | Preventing Costly Sewer Backups | Clayton County Water Authority |
| Hard bedrock under Wilkes soil | 40 to 60+ inches, beneath soft bedrock at 10–20 inches | Official Series Description — WILKES Series (USDA NRCS) |
More about Ellenwood
Laying the line
We start at the connection, not the house. Knowing the depth and location of the stub or main fixes the grade the whole line must hold. From there we set the route to avoid footings, driveways and other utilities, and set a cleanout near the right-of-way; on the Clayton side that cleanout is a CCWA requirement.↗
The ground decides the pace. On deep clay the trench goes quickly. Where the USDA maps Wilkes soil on the DeKalb side, soft weathered rock begins within two feet and harder rock can follow at forty inches or more, so the excavator works slower and the pipe needs a clean stone bed.↗
Before backfill the line is inspected as the permit requires and tested.
Henry-side jobs follow the same logic with a different owner of the public pipe. Henry County Water Authority maintains only its public sewer and sends owners to a plumber for private pipes on their land, so the new building sewer, its cleanouts and its grade are the property owner's to fund and ours to build. We confirm the authority's connection point and any inspection it wants before digging.↗
We start at the connection, not the house.
What it costs
Installation cost anchors
New sewer line, per linear foot
$40–$180
Typical market range — HomeGuide — Sewer Line Installation Cost (updated December 2025), 2025
Converting from septic to sewer
$3,000–$15,000
Typical market range — HomeGuide — Sewer Line Installation Cost (updated December 2025), 2025
Adding a cleanout
$500–$2,000
Typical market range — HomeGuide — Sewer Line Installation Cost (updated December 2025), 2025
What moves the price
These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.
Free estimate: (678) 863-5620- 01Distance and depth to the public connection
- 02Rock excavation where Wilkes soil is mapped
- 03Commercial pipe sizes and inspections
- 04Tank closure when a property leaves septic
FAQ
Ellenwood sewer installation questions
Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.
(678) 863-5620Can a day care in Ellenwood use a septic system?
Not if it serves more than six clients on the DeKalb side. DeKalb Public Health says county regulations prohibit on-site sewage systems for those day cares.
Who pulls the permit for a new DeKalb-side lateral?
A licensed plumbing or sewer contractor, before the private line is installed. The county's connection permit alone only grants the right to connect.
Source: DeKalb County Planning & Sustainability — Watershed Packet (revised 5/6/25)
Do I need a cleanout on a new Clayton-side line?
Yes. CCWA requires a cleanout on all laterals near the right-of-way and may ask for a second one at the building.
Source: Preventing Costly Sewer Backups | Clayton County Water Authority
When does Georgia require a house to connect to sewer?
Under state rule 511-3-1, when public sewer is available within 200 feet of the property line, and when a failing septic system has sewer available.
Source: Ga. Comp. R. & Regs. 511-3-1 On-Site Sewage Management Systems
Is rock a problem for new sewer lines in Ellenwood?
It can be on the DeKalb side, where Wilkes soil is mapped with soft bedrock at 10 to 20 inches. Elsewhere the soils are mostly deep.
Source: Official Series Description — WILKES Series (USDA NRCS)
What does DeKalb charge for a new residential sewer connection?
Its 2022 rate sheet lists a $1,811.93 residential sewer access fee.
Source: DeKalb County 2022 Current Rates — Water and Sewer Rates and Service Charges (via Wayback)
Sources
Where these facts come from
Rules, costs and local facts on this page link to the agency, code or publisher that states them. Cost figures are third-party market ranges, not our prices — estimates are free.
Reviewed by Atlanta Water & Sewage Solutions · Last updated
- 1DeKalb County Code Ch. 25, Art. IV, Div. 3 — Building Sewers and Connections (Municode, Supp. 72)
- 2DeKalb County Planning & Sustainability — Watershed Packet (revised 5/6/25)
- 3DeKalb County Planning & Sustainability — Z-26-1247833 packet with DeKalb Public Health rezone review comments (Nov. 19, 2025)
- 4Census Reporter: ZCTA 30294 (ACS 2024 5-year, table B25024)
- 5DeKalb County 2022 Current Rates — Water and Sewer Rates and Service Charges (via Wayback)
- 6Preventing Costly Sewer Backups | Clayton County Water Authority
- 7Official Series Description — WILKES Series (USDA NRCS)
- 8Henry County Water Authority — Customer Care FAQs
- 9HomeGuide — Sewer Line Installation Cost (updated December 2025)
- 10Ga. Comp. R. & Regs. 511-3-1 On-Site Sewage Management Systems

Ready when you are
Opening a business in Ellenwood? Get the sewer question answered first.
Call (678) 863-5620 to plan a new building sewer to the right county's system.