Sewer Line Installation & Replacement · Madison, GA
Sewer line installation and replacement for new and existing buildings on City of Madison sewer.
- Georgia DPH-certified installer & pumper
- Residential & commercial
- Local shop in Oxford, GA
Get a free estimate
or call (678) 863-5620The short answer
How much does a new sewer connection cost in Madison, GA?
Madison charges a connection fee tied to water meter size, $1,500 for a standard 3/4-inch residential meter, plus a $2,500 tap fee for a 4-inch sewer tap where the city has to make the tap. Commercial hookups can cost more. We install the private line from the building to the tap and handle replacements of old laterals.↗
Reviewed by Atlanta Water & Sewage Solutions · Last updated
What it costs
The city's fees, and what the pipe itself costs
Sewer connection, 1.5-inch meter
$7,500
Typical market range — City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026), 2026
Sewer connection, 2-inch meter
$12,000
Typical market range — City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026), 2026
Sewer tap, 6-inch
$3,000
Typical market range — City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026), 2026
New sewer line, installed, per foot
$40–$180
Typical market range — HomeGuide — Sewer Line Installation Cost (Dec. 22, 2025), 2025
Sewer cleanout installation
$500–$2,000
Typical market range — HomeGuide — Sewer Line Installation Cost (Dec. 22, 2025), 2025
Plumbing permit
$30–$500
Typical market range — HomeGuide — Sewer Line Installation Cost (Dec. 22, 2025), 2025
What moves the price
These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.
Free estimate: (678) 863-5620- 01Meter size the building needs, which sets the connection fee
- 02Whether a tap already exists from subdivision construction
- 03Bores or line extensions, which the city's rates do not include
- 04Depth of the main and the length of the run
The Madison story
Reading Madison's fee schedule before you build
The city's schedule has a few rules that change the math. Lots in a subdivision where taps were made during construction skip the tap fee. Businesses and mixed-use buildings pay whichever is higher, the listed fee for their meter or a charge based on expected daily flow.↗
Service is set up in person at City Hall on North Main Street, with photo ID and a deed or lease. The utilities office on Fairground Road handles the lines themselves.↗↗
- For mixed-use, commercial or industrial buildings, the sewer connection fee is the greater of the scheduled amount or projected daily wastewater flow times $6.00, and bores or line extensions are extra.↗
- In developments tapped during construction, Madison charges no tap fee, only the connection fee and a $500 meter set fee.↗
- Wastewater utility plans for new development are inspected at $2.00 per linear foot, versus $0.15 per foot for water.↗
The city's schedule has a few rules that change the math.
Sewer or septic?
Converting a Madison-area tank to city sewer
A house on the edge of Madison that still uses a septic tank may have a city main closer than its owner realizes. When the system fails, Georgia's 200-foot rule generally points to connecting rather than rebuilding.↗
Farther out, Morgan County's plan notes that most unincorporated land has no sewer at all, so the question never comes up and the answer is a septic repair.↗
A conversion is really three jobs done in order: the new lateral from the house to the city tap, the connection itself, and pumping and filling the old tank so it cannot collapse later. Doing all three in one mobilization saves a second trip across the yard. In the historic core, the replacement of a worn-out lateral follows the same sequence, only without the tank, and with more attention paid to walks, hedges and roots along the route.
Permits · City of Madison Utilities
How a new Madison sewer line goes in
Local facts
Where a new Madison line drains
Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.
| Topic | What it says | Source |
|---|---|---|
| Treatment | Indian Creek Water Reclamation Facility, permitted up to 1.0 MGD | Georgia EPD Public Notice No. 2017-18ML (October 17, 2017): NPDES applications |
| Sewer connection fees by meter | 3/4 in. $1,500; 1 in. $3,750; 1.5 in. $7,500; 2 in. $12,000 | City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026) |
FAQ
Madison sewer installation questions
Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.
(678) 863-5620What is Madison's sewer connection fee for a house?
$1,500 for a 3/4-inch meter under the schedule approved June 24, 2026. A 1-inch meter is $3,750.
Source: City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026)
Do I pay a tap fee if my lot is in a newer subdivision?
Not if the tap was made during subdivision construction. The city then charges only the connection fee and a $500 meter set fee.
Source: City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026)
How are commercial sewer connections priced in Madison?
At the greater of the meter-based fee or the projected daily wastewater flow in gallons times $6.00, as the City Manager determines.
Source: City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026)
Where do I set up new service?
At City Hall, 132 N. Main Street, weekdays 8 a.m. to 5 p.m. Bring photo ID, a copy of your deed or lease, and the utility service form.
What does the sewer pipe installation itself cost?
HomeGuide's national range is $40 to $180 per foot installed, about $1,600 to $7,200 for a 40-foot run.
Source: HomeGuide — Sewer Line Installation Cost (Dec. 22, 2025)
My old lateral keeps failing. Should I replace it instead of patching?
If a camera shows cracks, root entry and sags along most of the run, a single replacement usually beats repeated spot repairs. We show you the footage and price both.
Source: HomeGuide — Sewer Line Installation Cost (Dec. 22, 2025)
Nearby areas
Sewer installation near Madison
Sources
Where these facts come from
Rules, costs and local facts on this page link to the agency, code or publisher that states them. Cost figures are third-party market ranges, not our prices — estimates are free.
Reviewed by Atlanta Water & Sewage Solutions · Last updated
- 1City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026)
- 2HomeGuide — Sewer Line Installation Cost (Dec. 22, 2025)
- 3City of Madison, GA: Establish & Terminate Service
- 4City of Madison, GA: Utilities Department
- 5Ga. Comp. R. & Regs. 511-3-1 (On-Site Sewage Management Systems)
- 6Morgan County & Cities of Bostwick, Buckhead and Rutledge 2022-2036 Comprehensive Plan (GA DCA)
- 7Georgia EPD Public Notice No. 2017-18ML (October 17, 2017): NPDES applications

Ready when you are
New build or worn-out lateral in Madison? We run it to the tap.
Call for a free on-site estimate. We check the city fees that apply and lay the line to grade.
(678) 863-5620- Georgia DPH-certified installer & pumper
- Residential & commercial
- Oxford, GA
Free estimate