Sewer Line Installation & Replacement · Madison, GA

Sewer line installation and replacement for new and existing buildings on City of Madison sewer.

Madison, Morgan County · about 46 min / 33.7 mi by road from our Oxford shop. ZIP code 30650.
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Local shop in Oxford, GA

Get a free estimate

or call (678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

The short answer

How much does a new sewer connection cost in Madison, GA?

Madison charges a connection fee tied to water meter size, $1,500 for a standard 3/4-inch residential meter, plus a $2,500 tap fee for a 4-inch sewer tap where the city has to make the tap. Commercial hookups can cost more. We install the private line from the building to the tap and handle replacements of old laterals.

Reviewed by Atlanta Water & Sewage Solutions · Last updated

At a glance

County
Morgan County
ZIP codes
30650
Sewer
City of Madison Utilities (Indian Creek WRF GA0038741; Southside WPCP GA0023141)
Water
City of Madison Water Department (PWSID GA2110002)
From our shop
about 46 min / 33.7 mi by road from our Oxford shop
Population
4,447 (2020 Census)

What it costs

The city's fees, and what the pipe itself costs

City amounts are from Madison's schedule approved June 24, 2026. Contractor ranges are HomeGuide's national figures, not our prices.

What moves the price

These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.

Free estimate: (678) 863-5620
  1. 01Meter size the building needs, which sets the connection fee
  2. 02Whether a tap already exists from subdivision construction
  3. 03Bores or line extensions, which the city's rates do not include
  4. 04Depth of the main and the length of the run

The Madison story

Reading Madison's fee schedule before you build

The city's schedule has a few rules that change the math. Lots in a subdivision where taps were made during construction skip the tap fee. Businesses and mixed-use buildings pay whichever is higher, the listed fee for their meter or a charge based on expected daily flow.

Service is set up in person at City Hall on North Main Street, with photo ID and a deed or lease. The utilities office on Fairground Road handles the lines themselves.

  • For mixed-use, commercial or industrial buildings, the sewer connection fee is the greater of the scheduled amount or projected daily wastewater flow times $6.00, and bores or line extensions are extra.
  • In developments tapped during construction, Madison charges no tap fee, only the connection fee and a $500 meter set fee.
  • Wastewater utility plans for new development are inspected at $2.00 per linear foot, versus $0.15 per foot for water.

The city's schedule has a few rules that change the math.

Sewer or septic?

Converting a Madison-area tank to city sewer

A house on the edge of Madison that still uses a septic tank may have a city main closer than its owner realizes. When the system fails, Georgia's 200-foot rule generally points to connecting rather than rebuilding.

Farther out, Morgan County's plan notes that most unincorporated land has no sewer at all, so the question never comes up and the answer is a septic repair.

A conversion is really three jobs done in order: the new lateral from the house to the city tap, the connection itself, and pumping and filling the old tank so it cannot collapse later. Doing all three in one mobilization saves a second trip across the yard. In the historic core, the replacement of a worn-out lateral follows the same sequence, only without the tank, and with more attention paid to walks, hedges and roots along the route.

Permits · City of Madison Utilities

How a new Madison sewer line goes in

  1. 01

    Confirm the meter size and whether your lot was pre-tapped; that sets which city fees apply.

  2. 02

    Pay the connection and any tap fee, and set up service at City Hall, 132 N. Main Street.

  3. 03

    We trench and lay the private line on grade with cleanouts, camera it, and backfill once it is accepted.

Published fees

  • Sewer connection, 3/4-inch meterEffective 2026-06-24$1,500
  • Sewer tap, 4-inchEffective 2026-06-24$2,500
  • Sewer readiness-to-serve, 3/4-inch (monthly)Effective 2026-06-24$8.00

Local facts

Where a new Madison line drains

Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.

Public records.
TopicWhat it saysSource
TreatmentIndian Creek Water Reclamation Facility, permitted up to 1.0 MGDGeorgia EPD Public Notice No. 2017-18ML (October 17, 2017): NPDES applications
Sewer connection fees by meter3/4 in. $1,500; 1 in. $3,750; 1.5 in. $7,500; 2 in. $12,000City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026)

FAQ

Madison sewer installation questions

Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.

(678) 863-5620

What is Madison's sewer connection fee for a house?

$1,500 for a 3/4-inch meter under the schedule approved June 24, 2026. A 1-inch meter is $3,750.

Source: City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026)

Do I pay a tap fee if my lot is in a newer subdivision?

Not if the tap was made during subdivision construction. The city then charges only the connection fee and a $500 meter set fee.

Source: City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026)

How are commercial sewer connections priced in Madison?

At the greater of the meter-based fee or the projected daily wastewater flow in gallons times $6.00, as the City Manager determines.

Source: City of Madison, GA Schedule of Fees (Exhibit A, approved June 24, 2026)

Where do I set up new service?

At City Hall, 132 N. Main Street, weekdays 8 a.m. to 5 p.m. Bring photo ID, a copy of your deed or lease, and the utility service form.

Source: City of Madison, GA: Establish & Terminate Service

What does the sewer pipe installation itself cost?

HomeGuide's national range is $40 to $180 per foot installed, about $1,600 to $7,200 for a 40-foot run.

Source: HomeGuide — Sewer Line Installation Cost (Dec. 22, 2025)

My old lateral keeps failing. Should I replace it instead of patching?

If a camera shows cracks, root entry and sags along most of the run, a single replacement usually beats repeated spot repairs. We show you the footage and price both.

Source: HomeGuide — Sewer Line Installation Cost (Dec. 22, 2025)

Ready when you are

New build or worn-out lateral in Madison? We run it to the tap.

Call for a free on-site estimate. We check the city fees that apply and lay the line to grade.

(678) 863-5620
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Oxford, GA

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

Call nowFree Estimate