24/7 Emergency? (678) 863-5620
Open trench across a craftsman bungalow's front yard with old terracotta clay sewer pipe beside new white PVC pipe; illustrating sewer line installation for Eatonton, Georgia

Sewer Line Installation & Replacement · Eatonton, GA

Sewer line installation and replacement in Eatonton, from new EPWSA connections to full lateral replacements.

Eatonton, Putnam County · about 70 min / 51.6 mi by road from our Oxford shop. ZIP codes 31024, 31026.
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Local shop in Oxford, GA

Get a free estimate

or call (678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

The short answer

How do you get a new sewer line installed in Eatonton, GA?

In Eatonton the sewer authority, EPWSA, sells the connection only after Putnam County issues a building permit and a street address. You pay its full-cost connection fee, a tap fee plus a system development charge, and we install the private line from the house to the tap to grade, then camera it before backfill.

Reviewed by Atlanta Water & Sewage Solutions · Last updated

At a glance

County
Putnam County
ZIP codes
31024, 31026
Sewer
Eatonton-Putnam Water & Sewer Authority (Eastside WPCP GA0032271, Westside WPCP GA0032263)
Water
Eatonton-Putnam Water & Sewer Authority (PWSID GA2370000)
From our shop
about 70 min / 51.6 mi by road from our Oxford shop
Population
6,307 (2020 Census)

Permits · Eatonton-Putnam Water & Sewer Authority and Putnam County Planning and Development

The order things happen for a new Eatonton connection

Most of the waiting happens before the dig. Line these up first.
  1. 01

    Get the building or development permit and a street address. The county planning office issues both, including for lots inside Eatonton.

  2. 02

    Apply to EPWSA for the connection only once that permit and address exist; the authority takes the application at that point.

  3. 03

    Pay or finance the full-cost connection fee. The system development charge can be spread over 24 months interest-free, just as the tap fee can.

  4. 04

    We lay the private line to the tap on a steady grade, add cleanouts, and leave it ready for the authority's connection and any inspection.

Published fees

  • Sewer tap fee, 4-inchEffective 2025-05-16$2,772
  • Sewer system development charge with a 4-inch tapEffective 2025-05-16$1,810
  • Residential water/sewer depositEffective 2025-05-16$150

The Eatonton story

Why EPWSA charges what it charges

The authority splits the cost of joining into two pieces. The tap fee covers the labor and materials to make the physical connection. The system development charge is the new customer's share of plant and pipe capacity already built.

That capacity is under pressure. Putnam's plan describes residents moving into areas the authority does not yet serve and wanting to connect, while the authority itself is asking for money to relieve overloaded lift stations.

  • For a standard 4-inch sewer service, EPWSA's schedule totals the full-cost connection at $4,582: a $2,772 tap plus a $1,810 system development charge.
  • The joint plan notes more residents settling where EPWSA does not reach, and says the county wants those areas connected.

The authority splits the cost of joining into two pieces.

What it costs

Installation cost ranges, plus the authority's own fees

Contractor ranges are national figures from HomeGuide; the authority fees are EPWSA's posted schedule. Our estimate is free and specific to your lot.

What moves the price

These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.

Free estimate: (678) 863-5620
  1. 01Distance from the house to the tap and how deep the main sits
  2. 02Whether an old septic tank has to be pumped and abandoned
  3. 03Rock or dense red clay that slows trenching
  4. 04Crossing a driveway or sidewalk versus open yard

Sewer or septic?

Trading a tank for the sewer

Some houses around Eatonton still run on tanks even though an authority main passes nearby. When one of those systems fails, Georgia's rule is simple: if sewer is within 200 feet, connect.

Once connected, the old tank has to be pumped and properly abandoned, which we can do in the same visit as the new line.

Replacement is the other half of this service. A house from the 1950s or 1960s may still drain through its original lateral, and when a camera shows the whole run cracked, rooted or bellied, one new line from the foundation to the tap usually costs less over time than a string of spot repairs.

Local facts

What your new line connects to

Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.

Authority and federal records.
TopicWhat it saysSource
Monthly sewer base charge (in-city residential)$39.45, then $5.46 per 1,000 gallons from 1,001 to 2,000EPWSA Schedule of Rates, Fees, and Penalties (5.16.25, corrected)
Westside treatment plant permitGA0032263, effective through January 31, 2029EPA ECHO Detailed Facility Report: EPWSA Westside WPCP, NPDES GA0032263
Authority office663 Godfrey Road, Eatonton; (706) 485-5252Eatonton-Putnam Water & Sewer Authority (official site)

FAQ

Eatonton sewer installation questions

Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.

(678) 863-5620

When can I apply for an EPWSA sewer connection?

After Putnam County Planning and Zoning has issued your building or development permit and a street address. The authority's fee schedule ties the application to both.

Source: EPWSA Schedule of Rates, Fees, and Penalties (5.16.25, corrected)

What is EPWSA's full-cost connection fee for sewer?

It is a tap fee plus a system development charge. For a 4-inch sewer service the posted schedule works out to $2,772 plus $1,810, or $4,582.

Source: EPWSA Schedule of Rates, Fees, and Penalties (5.16.25, corrected)

Can I finance the connection fee?

Yes. EPWSA lets the system development charge be financed over 24 months without interest, like the tap fee. If service ends early, the balance comes due.

Source: EPWSA Schedule of Rates, Fees, and Penalties (5.16.25, corrected)

Do I have to switch from septic to sewer in Eatonton?

If your system fails and an EPWSA main is within 200 feet of the property or in the adjoining road, Georgia rules require the connection instead of a septic repair.

Source: Ga. Comp. R. & Regs. 511-3-1 (On-Site Sewage Management Systems)

How much does the pipe itself cost to install?

HomeGuide's national range is $40 to $180 per linear foot, or about $1,600 to $7,200 for a 40-foot run. Depth, clay and hardscape move it within that range.

Source: HomeGuide — Sewer Line Installation Cost (Dec. 22, 2025)

Who issues the building permit for a lot inside Eatonton?

Putnam County Planning and Development, which handles permitting for the City of Eatonton under the service delivery agreement.

Source: Putnam County, GA: Planning and Development

Ready when you are

Building or converting in Eatonton? We lay the line to the tap.

Tell us where the house sits and where the main runs. We will walk the route and give you a free written estimate.

(678) 863-5620
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Oxford, GA

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

Call nowFree Estimate