24/7 Emergency? (678) 863-5620
Trench at the curb of a suburban Georgia street where a new white PVC sewer lateral connects to the main; illustrating sewer line installation for McDonough, Georgia

Sewer Line Installation & Replacement · Mcdonough, GA

Sewer line installation and replacement in McDonough, Georgia, including connections ordered under the city's 90-day notice rule.

McDonough is the county seat. Septic permits and records: Henry County Environmental Health Office (District 4 Public Health), part of District 4 Public Health — Environmental Health (Wastewater Management).
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Local shop in Oxford, GA

Get a free estimate

or call (678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

The short answer

Sewer line installation in McDonough, GA

McDonough can order a hookup within 90 days once a public sewer sits within 100 feet of your property line. Atlanta Water & Sewage Solutions builds the new building sewer at grade to the property line, retires the old septic tank, and schedules the city inspection so its crew can make the final connection. Call (678) 863-5620.

Reviewed by Atlanta Water & Sewage Solutions · Last updated

At a glance

County seat
McDonough
Health district
District 4 Public Health — Environmental Health (Wastewater Management)
Septic permits
Henry County Environmental Health Office (District 4 Public Health)
EH office phone
470-661-0044
Population
249,960 (ACS 2020-2024 5-year, table B01003)
Median home built
2001

Sewer or septic?

The notice letter and the tank in the yard

The trigger is written notice from the city maintenance engineer. It can go to any owner whose property abuts a street, alley or right-of-way carrying city sewer within 100 feet of the lot line. From the notice date, the owner has 90 days and pays for the work.

The old system does not simply get disconnected. McDonough wants the septic tank pumped clean of sludge and backfilled with bank-run gravel or clean dirt, on a 60-day clock of its own.

How to tell which one you have

  • A dated letter from the city maintenance engineer
  • A manhole or cleanout in the street right in front of the lot
  • Neighbors on the same block recently connected

Permits · City of McDonough Water Department / city maintenance engineer

From application to the city's connection

Section 13.08.060 lays out the order of operations for a new building sewer.
  1. 01

    The owner or an agent applies on the city's form, with plans or other details the city engineer asks for, and pays the connection and permit fees.

  2. 02

    We lay a separate building sewer for each dwelling unit, below the first floor where possible, at uniform grade and at least three feet from bearing walls.

  3. 03

    Before any pipe is covered, the city is called to inspect; the tie-in to the public sewer is then made by a city representative.

  4. 04

    Trenches stay barricaded and lit, and any street or sidewalk we disturb is restored to the city's satisfaction.

Published fees

  • Sewer connection fee, 3/4-inch meter$1,665.77
  • Sewer connection fee, 1-inch meter$2,776.84
  • Sewer connection fee, 2-inch meter$8,883.57

Local facts

McDonough connection rules worth knowing

Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.

From the McDonough Code of Ordinances, Title 13, and the city's wastewater page.
TopicWhat it saysSource
Hookup distance and deadlineSewer within 100 feet of the property line; 90 days after written noticeMcDonough, GA Code of Ordinances § 13.08.020 Use of public sewers required (Municode, Supp. 15)
Connection fee table$1,665.77 (3/4 in.) up to $88,840.69 (8 in.), plus a tap-on fee; same inside and outside city limitsMcDonough, GA Code of Ordinances § 13.08.060 Building sewers and connections (Municode, Supp. 15)
Reusing an old building sewerAllowed for a new building only after city examination and testingMcDonough, GA Code of Ordinances § 13.08.060 Building sewers and connections (Municode, Supp. 15)
Where it all goesWalnut Creek Water Pollution Control Plant, first built in 1971 and expanded sinceCity of McDonough - Wastewater Treatment

What it costs

Budgeting a McDonough sewer installation

City fees come from the code. Construction ranges are HomeGuide's national figures (December 2025), not our pricing.

What moves the price

These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.

Free estimate: (678) 863-5620
  1. 01Length from the house to the property line, which is all on the owner
  2. 02Grade: a house sitting below the street may need a pump
  3. 03Abandoning and filling the old tank
  4. 04Concrete or landscaping to restore

Warning signs

When patching stops making sense

Seeing two or more of these? Call before it gets worse.

  • 1. A camera shows cracked or separated joints along most of the run
  • 2. The line has been dug and repaired more than once in a few years
  • 3. A tear-down or rebuild where the city will not accept the old pipe
  • 4. A connection notice on a lot still using a tank

The Mcdonough story

Single homes, duplexes and commercial pads

McDonough will not let neighbors share a building sewer. Every dwelling unit, including each unit in a multiple-dwelling building, and every commercial or industrial building gets its own line, which changes how we plan a duplex or a small strip center.

Commercial jobs usually carry larger meters, and the connection fee scales with them: a 2-inch service is listed at $8,883.57 before the tap-on charge. We work the trench schedule around business hours and restore parking and walks as we go.

McDonough will not let neighbors share a building sewer.

FAQ

Questions about new sewer lines in McDonough

Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.

(678) 863-5620

I got a letter saying I must connect to McDonough sewer. How long do I have?

Ninety days from the written notice, under section 13.08.020. The rule applies when the city sewer in an abutting street or right-of-way is within 100 feet of your property line, and you pay for the work.

Source: McDonough, GA Code of Ordinances § 13.08.020 Use of public sewers required (Municode, Supp. 15)

What happens to my septic tank after I connect?

It must be abandoned properly: pumped clean of sludge and filled with clean bank-run gravel or dirt within 60 days of the city's notice. We do the pump-out and fill as part of the job.

Source: McDonough, GA Code of Ordinances § 13.08.050 Private sewage disposal (Municode, Supp. 15)

What is McDonough's sewer tap fee for a house?

The code lists a proportionate-share connection fee of $1,665.77 for a 3/4-inch meter, the usual residential size, and $2,776.84 for 1-inch. The Water Department adds a tap-on fee for its labor, materials and equipment.

Source: McDonough, GA Code of Ordinances § 13.08.060 Building sewers and connections (Municode, Supp. 15)

Does the fee change if I'm outside McDonough city limits?

No. The code says the same connection fees apply to subscribers inside and outside the city limits, assessed per connection.

Source: McDonough, GA Code of Ordinances § 13.08.060 Building sewers and connections (Municode, Supp. 15)

Can my contractor make the final tie-in to the city main?

No. After the building sewer passes inspection, an authorized city representative makes the connection to the public sewer. We build everything up to that point and meet the inspector.

Source: McDonough, GA Code of Ordinances § 13.08.060 Building sewers and connections (Municode, Supp. 15)

How much does a new sewer line cost around McDonough?

HomeGuide puts new sewer line installation at $40 to $180 per linear foot, or $1,600 to $7,200 for about 40 feet, and septic-to-sewer conversions at $3,000 to $15,000. City fees are on top.

Source: HomeGuide — Sewer Line Installation Cost (updated December 2025)

Listed by the state

The Georgia Department of Public Health's September 18, 2026 lists include Atlanta Water & Sewage Solutions among certified septic tank installers and approved pumpers, which matters when a connection job also means retiring a tank.

Ready when you are

Holding a 90-day letter from the city? START THE CLOCK WITH A PLAN.

Send us the notice and the address. We will measure the run to the property line, price the line and the tank abandonment, and give you a free estimate on site.

(678) 863-5620
  • Georgia DPH-certified installer & pumper
  • Residential & commercial
  • Oxford, GA

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is sewage backing up inside? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Msg & data rates may apply. Reply STOP to opt out. SMS terms.

Call nowFree Estimate